Environmental Problem in My Building, What Do I Do? (Part II)

Step Four:  Corrective Measurers


Where the survey has identified the problem or material which is severely damaged, deteriorated, or causing problems, the building manager should decide which of the following three methods of corrective or remedial measures are going to be utilized.

  • REMOVAL: In most situations, removal will initially be the most expensive method.  However, depending on the circumstances, removal can be an economically preferred option.  Remember, removal is the only permanent solution.
  • ENCAPSULATION:  Encapsulation is a very successful option in dealing with environmental problems and involves covering the material or contaminated area with a strong impervious sealant.
    • The sealant’s (encapsulant) function is to enclose and prevent the exposure from the material or contaminated area.  In case of asbestos pipe insulation, elbows, or tees, the adhesive lagging is applied to cover and provide a hard-shell coating.  
    • Encapsulation requires periodic inspections, quarterly or annually, to monitor the condition of the ACM.
  • ENCLOSURE: The enclosure method permanently encloses the problem.  The enclosure must be completely airtight and this method is best used only where access to electrical, plumbing or ventilation services are not required.


Step Five:  Immediate Attention
For situations that require immediate attention, a contractors services can be retained on the following terms:       

  • Guaranteed Price Contract- to complete the initial removal or encapsulation work required for a fixed lump sum price.
  • Service Contract – on standing offer or on a time and materials basis. The contractor must be available to service your problem, just as your mechanical contactor services your air conditioning.  Every building manager should have a service contractor in case of an emergency.

Step Six:  Air Monitoring
With any type of removal, encapsulation, or enclosure air monitoring is a vital part of your liability protection, before during and after any abatement as outlined above, air monitoring should be conducted.  This shows the work was accomplished within regulatory compliance and protects claims of exposure.
    
It is suggested that air monitoring be conducted at period intervals to protect the building owner from exposure and nuisance claims by any building occupant or visitor.

Learn About Lead
Environmental Problem in My Building, What Do I Do...

Related Posts

arrow maskI Have an Environmental Problem, What Do I Do First? Click here to find out.

Asbestos Removal

absm2

Lead Based Paint Removal

lbpsm

Mold Removal

moldsm

Contact Us:  (405) 879-9788   bluemail

901 N.W. 80th St., Oklahoma City, OK 73114.

Copyright Mirage International, Inc. All rights reserved.

newlogofrsm

Veteran Owned Company
Member of many Veteran's Organizations
SCDVOB: Service Connected Disabled Veteran Owned Business

General Liability, Workmen's Comp, full liablity coverage.

AWARDS:
Award of Excellence
Commander Award for McAlester Army Ammunitions Depot

Over ten years operations & maintenance contracts with Tinker AFB Emergency Response.

Other Environmental Remediation Services

beforeafter2

 Bat Droppings: Before and After

Training Services

training

 Training Programs for Professionals